2026 planning examples
| Roof-area example | Model planning range |
|---|---|
| 1,000 sq. ft. · asphalt · typical roof | $5,300–$9,300 |
| 1,800 sq. ft. · asphalt · typical roof | $9,500–$16,700 |
| 2,500 sq. ft. · asphalt · typical roof | $13,100–$23,100 |
Canada-average model examples using standard selections unless stated otherwise. Rounded to the nearest $100; taxes are not automatically added.
Use roof area, not house floor area
A roof’s surface area changes with pitch, overhangs, attached sections and waste. Ask how the contractor measured the roof and what waste factor is included.
Write down the full assembly
Shingle brand and line, underlayment, ice-and-water membrane, flashing, vents, valleys and fasteners should be named. “Architectural shingles” alone does not define an equivalent scope.
Separate known work from unit prices
Deck replacement may not be fully visible before tear-off. A strong quote gives a unit price for plywood, deck boards or other discovered repairs instead of leaving the change open-ended.
Access and disposal are real cost drivers
Storeys, steepness, staging space and disposal distance affect labour and equipment. Confirm bin, dump fees, cleanup and magnetic nail collection in writing.
Dollar examples are rounded outputs from Home Cost Canada’s editorial planning model, not observed contractor quotes or official government price lists. Review the assumptions and limitations before using them.
Read the full methodology →Turn this example into your planning range.
Planning information only. Confirm scope, permits, site conditions, tax and final pricing with qualified local professionals.