Data version 2026.Q3

How every estimate is built.

The short version: a project baseline is adjusted for your scope and location. The honest version includes the assumptions, source roles and limitations below.

Current model2026.Q3Published for the current quarter and reviewed when source data or model assumptions materially change.
Dollar rangesEditorial planning modelNot an official government price list, contractor quote or claimed market median.
Official data roleTrend + market contextStatistics Canada evidence is used as a reasonableness and direction check, with the limits disclosed below.
01

The calculation

Planning rangebaseline unit cost × project size × scope factors × location factor

Baseline

Each tool starts with an internal low and high planning allowance for the useful unit: square feet, linear feet, window count, annual spend or total budget.

Project scope

Visible choices adjust that baseline. Kitchen cabinetry and layout matter differently from roof pitch or flooring preparation, so each calculator uses its own inputs.

Location

A coarse market factor adjusts the result. It is deliberately shown below rather than hidden behind a vague “local pricing” claim.

Worked example

180 sq. ft. standard kitchen, existing layout, Canada average

Low: 180 × $78 × 0.95 × 1.00 = about $13,300

High: 180 × $165 × 0.95 × 1.00 = about $28,200

The typical figure is weighted within that range; it is not a contractor quote or market median.

02

What the sources do — and do not do

Canada does not publish one official price list for a kitchen, roof or bathroom renovation. Home Cost Canada therefore separates official trend evidence from its own editorial dollar assumptions.

Statistics Canada BCPI table 18-10-0289-01Quarterly direction for contractor prices in residential and non-residential new construction.
Official table ↗
Statistics Canada BCPI program methodologyExplains the 15 markets, contractor sampling, included cost components and important limits.
Official methodology ↗
Statistics Canada Q2 2026 releaseUsed as a current trend check, not as a renovation price list.
Official release ↗
Important distinction

The Statistics Canada BCPI measures changes in prices contractors charge for representative new construction, not exact renovation prices. We use it to review market direction and regional context. We do not claim that Statistics Canada produced the calculator’s dollar ranges or every city factor.

03

Location adjustment table

These factors are internal planning adjustments, not official government multipliers. The 15 BCPI census metropolitan areas have direct trend coverage; the remaining markets use broader provincial and nearby-market context.

MarketPlanning factor
Vancouver, BC1.16×
Victoria, BC1.12×
Toronto, ON1.12×
Surrey / Fraser Valley, BC1.08×
Calgary, AB1.07×
Kelowna, BC1.07×
Hamilton, ON1.04×
Edmonton, AB1.03×
Ottawa, ON1.02×
Kitchener-Waterloo, ON1.01×
Canada average / not sure1.00×
London, ON0.97×
Montreal, QC0.96×
Halifax, NS0.96×
Kingston, ON0.96×
Red Deer, AB0.95×
St. John’s, NL0.95×
Winnipeg, MB0.94×
Saskatoon, SK0.94×
Regina, SK0.92×
Windsor, ON0.92×
Quebec City, QC0.91×
Charlottetown, PE0.91×
Moncton, NB0.90×
Fredericton, NB0.89×
Sherbrooke, QC0.88×
04

What is excluded

Not automatically added

  • GST, HST or provincial sales tax
  • Design and engineering fees
  • Financing and temporary accommodation
  • Unpriced hidden damage

Must be confirmed locally

  • Permits, inspections and municipal fees
  • Code, strata or condo requirements
  • Trade availability and contractor minimums
  • Site access and disposal conditions

The estimate does not inspect your property, confirm a permit, verify a product specification or replace written quotes. For heat-pump projects, use recent utility bills and an EnerGuide evaluation rather than treating the savings scenario as a guarantee.

05

Review log

Added fuller result explanations, visible estimate inclusions/exclusions, scope-driver summaries, condition/demolition inputs for kitchen and bathroom, and clearer model-version disclosure.

Published the 2026.Q3 calculator set and 25-market city comparison.

Next scheduled review: December 2026, or earlier if a major source update materially changes the model.